Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Patch 1 2 2020.10.2 3 for Adonis Personnel Portal is available for download. If you are affected by any of the issues from the "Release notes" below, please download and upgrade your system.


To make sure that everything works properly, please install the patch on your test environments first.


Page Properties
idrelease-patch


SoftwareDownload LinkLatest PatchRelease Date
Adonis Personnel Portal2020.10.2

 

Adonis Personnel Portal2020.10.3

 


Patch 2020.10.3.

 

Key

Summary

Release Notes

APP-2080Extend method TAA_GetTimecardByPeriod with additional fields for better performance

Added new parameters to the ТAA_GetTimecardByPeriod response:
"NormalHours": "string",
"WorkHours": "string",
"RestHours": "string",
"DrillHours": "string",
"MealHours": "string",
"SideDutyHours": "string",
"SickHours": "string",
"Overtime": "string"

APP-2137WDA - Creating travel activities and updating datefrom / date to existing onboard/course activity

Implemented possibility for WDA document to update the time fraction of onboard activity.
Activity Date From time fraction =  Travel To End time + 1hr.
Activity Date To time fraction = Travel From Start time - 1hr.

Image Added






Patch 2020.10.2.

 

Key

Summary

Release Notes

APP-2021No 'Travel Form' tab name for TE document mobile

Fixed 'Travel form' tab visibility for mobile Travel Expense.

APP-2123Add TLS 1.2 Support TLS 1.2 support improvements.
APP-2124Return possibility to add custom backgrounds for login screens

Return possibility to upload customer background image. Wallpaper would be saved into database automatically after uploading. Fixed password recovery functionality.

APP-2126Split of current changelog method into 2 separate methods 

CONTENTHUB_CHANGELOG method divided into two separate methods:

CONTENTHUB_CHANGELOG_DOCS - returns all documents changed in given DateFrom-DateTo time span.
CONTENTHUB_CHANGELOG_LOCATION - returns all vessel IMO's where this doc should go including all current activities as well as planned to start within defined number of days.